January 15, 2011: All the walls on the new second floor are completed and the roof is getting ready to be poured. The new stair case is also in place from the 1st to 2nd floor and the stairs to the roof are all ready framed out. See below some pictures of the new roof area and 2nd floor patio.
|
|
|
|